Question raised in Lok Sabha on Drinking Water and Sanitation Schemes, 11/08/2016. As per the information entered by the States on the Integrated Information Management System (IMIS) of the Ministry, as on 07.08.2016, there are 57,489 ongoing schemes in different States of the Country to provide drinking water to the rural population in the country. The details are given in Annexure. In
Jammu & Kashmir there are 1838 ongoing rural drinking water supply schemes.

Question raised in Lok Sabha on Drinking Water and Sanitation Projects, 11/08/2016. Under Swachh Bharat Mission (Gramin) {SBM(G)}, the programmatic projects are sanctioned district-wise. Currently, 650 district sanitation projects have been sanctioned and under implementation. 43 districts projects have been received and sanctioned during last 3 years and current year. The State/UT wise details is at Annexure - I. No project is pending under SBM (G). The State-wise details of funds released to the States under NRDWP are at Annexure-II.

Question raised in Lok Sabha on Contaminated Drinking Water, 11/08/2016. As per the National Rural Drinking Water Programme (NRDWP) guidelines, 10% of the total budget is allocated to North Eastern States.

Question raised in Lok Sabha on Power Generation, 11/08/2016. The details of various power projects commissioned during the last two years and the current year, along with the quantum of electricity generated thereof is given at Annex. The electricity generation in the country increased to 391,163.27 Million Units (MUs) during the year 2016-17 (April, 2016 to July, 2016) from 365,146.09 MUs during 2015-16 (April, 2015 to July, 2015), thus registering a growth of 7.13%.

Question raised in Lok Sabha on Pending Projects Due to Environment Clearances, 11/08/2016. As informed by Ministry of Environment, Forests & Climate Change (MoEF&CC), being the nodal Ministry for according environment clearance, fifteen Hydroelectric Projects and ten Thermal Power Projects are pending for Environmental Clearance as on 5.8.2016 as per details given in Annex-I & II respectively.

Question raised in Lok Sabha Hydro Power Plants, 11/08/2016. Nine Hydro Electric Projects, with a total capacity of 2357 MW, were commissioned during the last two years, and the current year (till 31.07.2016) in various states of the country. Out of these 9 projects (2357 MW), three projects were partially commissioned during this period and the details thereof are given at Annex-I. Detailed Project Reports (DPRs) of 15 Hydro Electric schemes with a total Installed Capacity of 8,457 MW have been received by various appraising Groups in CEA/CWC/GSI/CSMRS as on 30.6.2016 for examination.

Question raised in Lok Sabha Electrification of Villages, 11/08/2016. As per census 2011, there were 16,78,26,730 rural households in the country. Out of which 9,28,08,038 households were having electricity and remaining 7,50,18,692 households were un-electrified. State-wise details of rural and urban area households are given at Annexure. Since 2012-13, free electricity connections to 53,26,016 Below Poverty Line ( BPL) households have been released as on 30.06.2016.

The Factories (Amendment) Bill, 2016 was introduced in Lok Sabha on August 10, 2016 by the Minister for Labour and Employment. The Bill amends the Factories Act, 1948. The Act regulates the safety, health and welfare of factory workers. The Bill amends provisions related to overtime hours of work.

The Motor Vehicle (Amendment) Bill 2016, which is a historic Step towards making roads safe and saving lakhs of innocent lives, was introduced in the Lok Sabha on 9th August, 2016. The Amendment aims to address the issue of road safety and improve the facilitation of the citizens while dealing with transport departments.

Question raised in Lok Sabha on Polluted River Stretches, 09/08/2016. As per the report published by Central Pollution Control Board (CPCB) in February 2015, 302 polluted river stretches have been identified on 275 rivers in the country based on Bio-chemical Oxygen Demand (BOD) levels, a key indicator of organic pollution. The State-wise details are at Annexure-I. The details of funds released to various State Governments for implementation of pollution abatement schemes during the last three years under the NRCP/NGRBA, State-wise are at Annexure-II.

Pages