No dedicated site for disposing of 400 tonnes of garbage generated in Jammu

Postponed for 13th Five-Year Plan (2017-21) after missing two deadlines

Order of the National Green Tribunal (Principal Bench, New Delhi) in the matter of Dr. Irfan Ahmad & Ors. Vs. Mr. Nawang Rigzin Jora & Ors. dated 03/07/2014 regarding landfill dumping site at the Achan dumping site in the outskirts of Srinagar.

Funds that have been sanctioned by the Central Government have not yet been disbursed to Jammu & Kashmir to take action, the NGT was informed.

Previous Orders

DEBATES YATRA‘A disaster needs to be prevented’

Groundwater samples (n = 163) were collected across Kashmir Valley in 2010 to assess the hydrogeochemistry of the groundwater in shallow and deep aquifers and its suitability for domestic, agriculture, horticulture, and livestock purposes. The groundwater is generally alkaline in nature. The electrical conductivity (EC) which is an index to represent the total concentration of soluble salts in water was used to measure the salinity hazard to crops as it reflects the TDS in groundwater ranging from 97 to 1385 μS/cm, except one well in Sopore.

Recent studies in India indicate rising trends of diabetes even in rural areas. Continuous monitoring of the diabetes situation is required by repeated cross sectional studies in different parts of the country both urban rural to plan control measures. The aim of the study was to estimate the prevalence of Type 2 diabetes in a sample of rural population and explore associations between diabetes and known risk
factors.

The constructions carried in Sonamarg, the Meadow of Gold, which lies between Kolhoi Glacier and Machoi Glacier, are on without carrying an Environment Impact Study.

An attempt was made to understand the influence of climate change on future potential distribution of Oriental fruit fly (OFF), Bactrocera dorsalis (Hendel), a polyphagous pest on a wide variety of fruit crops in India.

Original Source

The ministry of road transport and highways has approved road projects worth about Rs 40,000 crore, besides setting a target of building 30 km of roads a day from 2016.

To study the issue of rehabilitation of the affected persons due to stone quarrying, the State Government has constituted a committee.

Pages