Singapore Australia is set to unlock more than A$13 billion in government funds for clean energy that could boost investments for large solar power stations, but wind farm developers are at risk if

Use of renewable energy can help meet industries meet thermal energy and cooling requirements.

Northern Rajasthan is quickly becoming a hub for solar energy in India. The 15th October was the deadline for some of the first major projects of 5 Megawatt capacity each and most plants are now feeding into the electricity grid.

Project proposals total 2,500 MW solar energy in second batch of bidding. Launched last year, the ambitious Jawaharlal Nehru National Solar Mission of the government (JNNSM) continues to lure private players. For the 350 MW of capacity proposed in the second batch of the phase one of the solar mission, requests have come pouring for a total of 2,500 MW capacity. The first phase of the solar mission running from 2010 to 2013 has a target of connecting 1,000 MW solar capacity to the national electricity grid. The first phase has two batches.

Because the price of solar panels is plummeting, large ground-mounted photovoltaic plants are squeezing solar thermal power plants out of the market. Is the future of concentrated solar power already over?

Solar energy has experienced phenomenal growth in recent years due to both technological improvements resulting in cost reductions and government policies supportive of renewable energy development and utilization. This study analyzes the technical, economic and policy aspects of solar energy development and deployment.

The U.S. Energy Department finalized loan guarantees for two major solar projects on Wednesday, as the deadline loomed for the government's renewable-energy incentive program.

The US government’s $8-billion bet on solar energy that would pave the deserts with mirrors risks following the Betamax into the technological wilderness because of Chinese backing for a cheaper system.

In this article, an attempt is made to answer the question: Can renewable energy sources eventually supply India’s electricity needs in the future? The estimates made here indicate that even with a frugal per capita electricity need of 2000 kWh/annum and a stabilized population of 1700 million by 2070, India would need to generate 3400 TWh/yr. As opposed to this, a systematic analysis of the information available on all the renewable energy sources indicates that the total potential is only around 1229 TWh/yr. It is concluded that in the future as fossil fuels are exhausted, renewable

Gujarat, Rajasthan, and Tamil Nadu are front runners among states that have grid connected solar power plants.

Pages