The State government, specifically the Public Works Department (PWD), has no clue as to what the farmers did with Rs.75 crore of Central funding meant for creating artificial recharge systems (ARS) in their agricultural fields.

The Comptroller and Auditor General of India (CAG) report has found that only 21,214 out of 2.93 lakh farmers utilised the money to construct ARS, which defeated the objective, improving groundwater using rainwater run-off from their own agricultural fields.

Around 30 per cent of the groundwater resource in the state is unfit for both drinking and agriculture, a fact that has sparked concern in the groundwater department authorities since water sources

P.M.Natarajan, Working Group member, Planning Commission, Government of Tamil Nadu, and a noted geologist, has welcomed the proposed Rs.1,560 crore-project to refurbish old tail-end sluices and con

Water woes for Bangaloreans will continue with fresh government data demonstrating that the current level of water supply in India's IT capital is almost four thousand million cubic metre short of the requirement, exposing 22 lakh people to water scarcity every year.

Every drop countsThe shortfall is in the prevailing situation. If City aquifers become barren due to over-exploitation, an additional 24 lakh will have a tough time getting their daily water supply from civic authorities, geologists have forewarned. The warning is based on water data collected by the Karnataka government's mines and geology department from 10 deep wells in Bangalore, between April and December 2011.

Ground water levels are being measured four times a year during January, April/ May, August and November. The regime monitoring started in the year 1969 by Central Ground Water Board. At present a network of 14966 observation wells located all over the country is being monitored.

In the developing world climate change has far more ramifications than can be addressed by controlling just carbon
emissions. The developed world has stable populations and landscapes, and is thus affected mainly by the air which
spreads democratically without boundaries. On the other hand, the developing world with increasing populations and
consumption is depleting its living natural resource base of water, forest, soils and agriculture, and is poised for a far

Work to construct rainwater harvesting structures in stormwater drain network to begin next month

Work on construction of rainwater harvesting structures in stormwater drains by the Chennai Corporation is expected to begin in May when the water table is the lowest in the city. The civic body had announced that over 5,000 rainwater harvesting structures would come up across the city.

Arsenic contamination of ground water from Yamuna floodplains in Delhi is several times the permissible limit and the prime culprit for this poisoning is fly ash and other residue from Delhi’s ther

Over 1200 works of water recharging were carried out by the Public Health Engineering Department with a view to increasing groundwater table in the areas around existing drinking water schemes in t

Who is to be blamed for water scarcity during summer months? Are the developers making necessary arrangements for rainwater harvesting?

Pages