Tenders of one and four package of Dummugudem-Nagarjunasagar Project tail pond link canal, the first of its kind in the country in river linkage of Godavari and Krishna rivers, would be put online for e-procurement on February 27. The first package is an approach canal from zero to 6.5 km and water would be drawn from Godavari at the time of floods and it would be taken to the tail pond of Nagarjunasagar reservoir. Water would be drawn when the river crosses 52.5 feet and would be diverted through 6.5 km length approach canal on gravity. There is no need for lifting it to the point. The contracts would be called on engineering-procurement-construction (EPC) system. Though the engineers of the project evolved a plan for the packages on behalf of the government the companies which obtained the tenders have to submit fresh engineering, procurement and construction plans for the packages of the project. As a result, the cost may be reduced or increased as per the approved plan. The fourth package is for constructing a pump house for 20,000 cusecs and digging a canal from 38.5 km to 48 km. The project officials planned to call the tenders on February 21 but it was postponed to February 27 to finalise the cost of the two packages. Officials are tight-lipped about the cost of the project, but sources said that the two packages would cost Rs 550 crore. The total cost of the project is estimated to be Rs 8,930 crore and the project work would be divided into more than 18 packages. Water can be drawn only during floods.

The multi-crore Polavaram project in Andhra Pradesh is currently embroiled in legal issues. But now, the project is being contested on technical issues as well. A study carried out by the

The present study was undertaken to ascertain the quality of Godavari river water.

Water samples were collected from different places in Godavari River located at Sangam point in Maharashtra and Basar point in Andhra Pradesh. The results obtained are compared with drinking water standard (BIS-10500). The results obtained envisaged that pH value of drinking water samples were slightly neutral but the maximum pH was recorded in the site III at Bastar point (Andhra Pradesh) sampling location and minimum value 7.22 was noticed in site III at Sangam point.

ScienceDaily

Perspectives on Polavaram, A Major Irrigation Project on Godavari

the Andhra Pradesh government unveiled a new sand policy to protect riverbeds, waterbodies and groundwater on November 14, 2006. It says this is to control the powerful lobby of sand contractors and

on august 7, 2006, the Orissa state legislative assembly unanimously resolved to oppose the Andhra Pradesh government's decision to dam the Godavari river at Polavaram.

FEW roads cruise so perfectly through life's close hits and misses as the road to Kondamodalu - a quiet, beautiful village nestled in the Papikondalu hills in Devipatnam mandal of East Godavari district in Andhra Pradesh - does.

2001: THE old man shuffled his feet, acutely embarrassed. No matter which part of India you're in, the first thing you do is offer your guests a glass of water. And this was one part of Nallamada in Andhra Pradesh blessed with that element. Things had changed, though. "Please don't drink it," he said, finally. "See how it is?" he asked, showing us a tumbler.

Pages