Enable Block: 

A study was conducted to estimate the rate of solid and dissolved mass denudation from six prominent landuse systems of Bhetagad micro watershed, Gomti basin of Indian Central Himalaya. An investigation was also conducted to assess the seasonal variation in water quality parameters influenced by rainwater in the four sub-catchments of Gomti basin.

Elevated arsenic in groundwater is the greatest environmental problem in Bangladesh. Spatial variability of arsenic in groundwater has been examined by semivariogram analysis that revealed high degree of small-scale spatial variability in alluvial aquifers. Small-scale variability of arsenic concentrations, indicated by high "nugget' values in semivariograms, is associated with heterogeneity in local-scale geology and geochemical processes. In unsampled locations, arsenic concentrations have been predicted using both deterministic and stochastic prediction methods.

The South Pacific nations recently agreed to stop bottom trawling to protect corals and other marine life. Bottom trawling is a fishing method where boats tow heavy trawl nets along the sea

The Kathmandu reaches of the Bagmati River are widely characterised as severely degraded. This article explores the rhetorical life and death of the concept of a 'Bagmati civilisation': a particular configuration of history, cultural identity and river ecology espoused by a prominent Nepali river restorationist.

The physico-chemical quality study of the underground water in Alwar town of Rajasthan has been taken up to evaluate its suitability for domestic purpose. 56 ground water samples were collected from different places of Alwar town.

Scotland's biggest sewage treatment facility, Seafield, is back in working condition after causing a major sewage spill in the last week of April. The spill contaminated the estuary, Firth of Forth,

Construction work was stopped at a biomedical waste incineration facility in Rajasthan's Kota district following opposition from local people. Construction of the plant started in March 2007 without

Vishnubhai Patel was an operator-cum-fitter with Green Environment Services Co-operative Society Ltd. He claims he was sacked in August 2006, a little over a year after exposing the society's

For 40 years the story of Brofiscin Quarry

Zimbabwe has announced plans for culling and contraception to slow down rampant elephant population growth. The announcement comes close to a recent incident in which a rogue elephant trampled to

Pages